The Philadelphia Water Department (PWD) supplies drinking water, wastewater, and stormwater services to customers within the City of Philadelphia. PWD maintains a network of over 6,800 miles of water mains and sewers, six treatment facilities, and 34 pumping stations. PWD Field Head Quarters in Upper North Philadelphia has served as a field site since 1914 with the earliest current buildings dating to 1923. Over the past century, the site has expanded from two departments and a few employees to a current population of 387 daily users across eight departments. In addition to employees’ personal vehicles, 329 PWD-owned vehicles are on site daily. PWD initiated a master plan as the first phase of renovations to transform the ad hoc and dated conditions into a modern work environment for the next 50 years.

BKP performed the master plan, programming, research, and building assessment to help PWD understand its existing site assets and plan for proposed improvements. BKP began by surveying the property with various user groups to understand daily operations and site flow. Over 19 visits, BKP toured and surveyed over 200,600 square feet of space, including three buildings, 15 workshops, three warehouses, three outbuildings, and five storage depots/yards across the 17-acre site. BKP collaborated with landscape architects and civil engineers on a comprehensive site analysis that documented zoning; grade changes; vegetation; vehicular, pedestrian, and material circulation; and how circulation affects traffic within the adjacent neighborhood. BKP conducted 12 program interviews with leaders of the nine main PWD departments and three sub-groups to discuss departmental needs and anticipated changes over the next decade. From here, BKP worked with PWD Design to develop space standards for offices, warehouses, workshops, storage, meeting rooms, and parking. Using space standards and anticipated staffing, BKP created a matrix of spatial needs for each department individually and the site in its entirety. BKP completed the process by developing blocking plans for each department and building and creating a site master plan to address all user needs. BKP reported to a team of three Core Review Committee members representing Conveyance, Facilities Management, and Administration.

  • Client

    Philadelphia Water Department

  • Size

    17-acre site | 206,000 square feet of buildings

Renderings © BKP Architects