Plagued by cracked underground pipes due to soil instability, the 40-year-old Hanover Pool closed in 2019. The need to renovate the pool prompted a community engagement process that transformed the pool area into an all-ages aquatic recreation center. Tasks involved a feasibility study that included public meetings, a survey of over 100 community members, and collaboration with a township-formed pool study committee to rethink and redesign the venue.
The collaborative design concept coalesced around the idea of reusing the pool’s footprint and adding a slash pad sprayground to extend the pool season from early May until the end of September without the need for lifeguards. In partnership with Viridian Landscape Studio, BKP created a great lawn green space where guests can sunbathe during the pool season and where the township or community members can host events during the shoulder seasons. BKP also collaborated with Colliers Engineering and Design to stabilize the underlying sinkhole-prone limestone and prevent future settlement issues.
Many of the new pool’s features were identified and prioritized through community engagement. The pool includes a slide, wading pool, underwater seating, zero-depth entry area, and competitive swimming lanes. Amenities around the pool include a guest check-in area, snack stand with food truck parking, updated lighting, new restrooms and pump room, and a dedicated lifeguard storage room. Canopies and trees selected because they don’t shed leaves provide shade while keeping the pool area clean. The pool is fenced for safety. White board-and-batten siding with patina-green roofs give the new pool environment a Caribbean beach club vibe.
-
Client
Hanover Township
-
Cost
$5 million
-
Size
2.1 acres
Images © Jeffrey Totaro